Energy regulator determines TransGrid didn’t consider all credible routes for HumeLink project

The Australian Energy Regulator (AER) has determined TransGrid failed to consider all credible options for its HumeLink project, in what is considered a big victory for landowners opposed to powerlines running through private land as per original plans. This development is significant because failure to consider all credible options is a breach of the requirements … Continue reading Energy regulator determines TransGrid didn’t consider all credible routes for HumeLink project